Lucent Technologies Release 7 User Manual
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1914
VC-DSPPT
9
Error Log Entries and Test to Clear Values
Notes:
a. This port has been busied out by the busyout port UUCSSpp command.
b. The VC DSP Port NPE Crosstalk Test(#1103) failed.
c. The VC DSP Port Local TDM Loopback Test(#1104) failed. Run the Long
Test Sequence.
d. A critical hardware failure has been detected on the circuit pack. Reset
the port by the busyout port UUCSSpp and reset port UUCSSpp
commands. If the VC Reset DSP Test (#1106) passes, then the on-board
circuitry is healthy. Retire the alarm with the test port UUCSSpp long
clear command.
commands. If the VC Reset DSP Test (#1106) passes, then the on-board
circuitry is healthy. Retire the alarm with the test port UUCSSpp long
clear command.
e. The VC DSP port reported loss of framing on the Service Channel between
the VC and MMI circuit packs.
f. The VC DSP Port DSP Loopback Test (#1105) failed.
g. The DSP corresponding to this port on the VC circuit pack reported a
firmware error. No action is required.
Table 9-706.
VC-DSPPT Error Log Entries
Error
Type
Aux
Data
Associated Test
Alarm
Level
On/ Off
Board
Test to Clear Value
0
1
1.
Run the short test sequence first. If all test pass, run the long test sequence. Refer to the appropriate
test description and follow the recommended procedures.
test description and follow the recommended procedures.
0
Any
Any
Any
test port UUCSSpp sh r 1
18 (a)
0
busyout port UUCSSpp
WNG
OFF
release port UUCSSpp
257 (b)
Any
NPE Crosstalk Test (#6)
MIN
ON
test port UUCSSpp 1 r 3
513 (c)
Any
VC DSP Port Local TDM
Loopback Test (#1104)
Loopback Test (#1104)
MIN
ON
test port UUCSSpp sh r 3
778 to
781 (d)
781 (d)
Any
VC Port Reset DSP Test
(#1106)
(#1106)
MAJ
ON
See note (d)
1025 (e)
WNG
ON
1281 (f)
Any
VC DSP Port DSP
Loopback Test #(1105)
Loopback Test #(1105)
MIN
ON
test port UUCSSpp sh r 3
3840 (g)