Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1926
VC-SUMPT 
9
Error Log Entries and Test to Clear Values
Notes:
a. This port has been busied out with the busyout port UUCSSpp 
command.
b. The circuit pack has been removed or has been insane for more than 
11-minutes. To clear the error, replace or reinsert the circuit pack.
c. The NPE Crosstalk Test(#1103) failed.
d. The VC Summer Port Local TDM Loopback Test(#1100) failed.
System Technician-Demanded Tests: Descriptions 
and Error Codes
Always investigate tests in the order presented in the table below. By clearing 
error codes associated with the NPE Crosstalk Test, for example, you may also 
clear errors generated from other tests in the testing sequence.
Table 9-712.
VC-SUMPT Error Log Entries 
Error 
Type
Aux 
Data
Associated Test
Alarm 
Level
On/Off 
Board
Test to Clear Value
0
1
1.
Run the short test sequence first. If all test pass, run the long test sequence. Refer to the appropriate 
test description and follow the recommended procedures.
0
Any
Any
Any
test port UUCSSpp sh r 1
18 (a)
0
busyout port UUCSS
WNG
OFF
release port UUCSSpp
130 (b)
WNG
ON
test port UUCSSpp sh
257 (c)
Any
Control Channel Loop Test 
(#52)
MIN
ON
test board UUCSSpp 1 r 3
513 (d)
Any
VC Summer Port Local 
Loopback Test #(1100)
MIN
ON
test board UUCSSpp sh r 3
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1.
D = Destructive; ND = Nondestructive
NPE Crosstalk Test (#6) (a)
X
D
TDM Loopback Test (#1100)
X
X
D