Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-253
ATM-SYNC (ATM Synchronization) 
9
PPP Link Status Inquiry Test (#1279)
This non-destructive test determines the state of the PPP link. If the link is 
connected, this test passes. The test fails if the PPP link is disconnected.
2500
ABORT
Internal system Error.
1. Retry the command at 1-minute intervals a maximum of 3 times
FAIL
All sessions on PPP link are down.
1. Test the port (test port UUCSSpp long) and verify the result of the 
SCOTCH Synchronous Local Loop Around Test (#1275).
2. If the test fails, escalate the problem. 
3. If the test passes wait for the sessions to come up.
PASS
All sessions on PPP link are up.
Table 9-110. TEST #1279 PPP Link Status Inquiry Test 
Error 
Code
Test 
Result
Description/ Recommendation
1125
ABORT
PPP Link is not in service.
1. Check if the PPP link is in-service or not. If the link is not in service, 
release the link (release link 
n or release port UUCSSpp) and repeat 
the test. This is a normal abort.
2100
ABORT
The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2500
ABORT
Internal system Error.
1. Retry the command at 1-minute intervals a maximum of 3 times
FAIL
PPP link is down.
1. Test the port (test port UUCSSpp long) and verify the result of the 
SCOTCH Synchronous Local Loop Around Test (#1275).
2. If the test passes wait for the link to come up.
PASS
PPP link is up.
Continued on next page
Table 9-109.
TEST #1287 Session Restart Test  — Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page