Cal Flame A734L User Manual

Page of 32
LTR20091024, Rev. A
1
Pre-Delivery and Installation 
Checklist
Most cities and counties require permits for exterior construction and elec-
trical circuits. In addition, some communities have codes requiring resi-
dential barriers such as fencing and/or self-closing gates on property to 
prevent unsupervised access to the property by children under the age of 
5. Your dealer can provide information on which permits may be required 
and how to obtain them prior to the delivery of your spa.
We strongly recommend you have a qualified, licensed contractor perform 
the installation of your in-ground or ported spa. The installation instruc-
tions contained in the manual are for the use of a qualified contractor or 
installer.
Consumers who choose to install their own in-ground spas bear sole re-
sponsibility for any performance or warranty issues and may void portions 
of their warranty as a result. For this reason, we strongly recommend they 
hire an experienced professional for their installation.
For additional operating and installation information, please see your sell-
ing dealer.
Portable Spa 
Pre-Delivery Checklist
Before Delivery
Plan your delivery route
Choose a suitable location 
for the spa
Lay a 3” -  4” concrete slab
Install dedicated electrical 
supply
After Delivery
Place spa on slab
Connect electrical compo-
nents
 
In-Ground Spa 
Pre-Delivery Checklist
Before Delivery
Plan your delivery route
Choose a suitable location 
for the shell and equipment 
pack
Excavate the hole
Install dedicated electrical 
supply
Install dedicated NG line for 
gas heater
After Delivery
Install shell in ground
Install equipment pack
Connect plumbing
Connect electrical compo-
nents
Pour the deck