Cal Flame Spa Home Resort User Manual

Page of 10
2009 Villa
LTR20091034, Rev. A
Assemb
ly
www.calspas.com
2
Column Placement
Reference your column placement chart for the particular villa you purchased. The center point measurements 
will be described for your particular sized villa. Please locate these dimensions and mark them on your floor 
or professionally laid slab. If your municipality requires a footing please see our recommendations for proper 
column installation.
Anchoring the Main Support 
Post
When scoring the concrete, make sure that the mark 
is dark enough to see, as you will be drilling a hole in 
the  concrete.  This  hole  will  be  where  the  anchoring 
bolt is located. Also, it is the owner’s responsibility to 
obtain a 1/2” masonry bit. This bit will be used to drill 
the anchoring holes in the foundation. A masonry bit 
may be bought at any local hardware store.
Refer to Figure 1 for steps 1 through 3.
Pre-drill the anchoring hole using a 1/2”masonry 
1. 
drill  bit  (see  NOTE  above).  Drill  the  hole  to  a 
depth of no less than 3”. Using a hammer, insert 
the  anchoring  bolt  by  gently  tapping  the  bolt 
into  place.  Continue  to  tap  into  place  until  the 
anchoring bolt is seated securely in the hole.
After drilling the hole and inserting the anchoring 
2. 
bolt, slide the main support post assembly on to 
the  anchoring  bolt  and  tighten  down  using  the 
provided hardware.
Repeat  these  steps  for  all  four  corners  of  the 
3. 
villa.
Figure 1. Anchoring the main support post
Villa Assembly