Rubbermaid 1S84 User Manual

Page of 16
Level construction site before beginning assembly of shed. A foundation may be 
constructed if desired.
1
FLOOR PLAN:
Size the construction site to fit the entire floor. Allow clearance for opening front and back doors.
OPTIONAL STEP:
If desired, recessed anchor locations (8 places) can be used to anchor the shed floor to a foundation 
after Step 6.
84"
127
7
/
16
"
 7-1/2
190
[
]
 37-5/8
955
[
]
81-1/2
2070
[
]
 4-1/8
106
[
]
 128-7/8
3273
[
]
 7-1/2
190
[
]
 84-3/8
2142
[
]
 4-1/8
106
[
]
  4-1/8
106
[
]
  39-7/8
1014
[
]
 4-1/8
106
[
]
 3-3/4
95
[
]
 127-1/8
3228
[
]
4
1
/
8
"
76
"
128
7
/
8
"
127
7
/
16
"
81
1
/
2
"
37
5
/
8
"
127
1
/
8
"
7
1
/
2
"
7
1
/
2
"
4
1
/
8
"
3
3
/
4
"
30"
30"
84"
4
1
/
8
"
4
1
/
8
"
ANCHOR
LOCATIONS
Using a utility knife, cut the long sides of each wall slot tab and then use a screwdriver to knock it out 8 places on Front Floor Panel (J-5H51). Open hinge holes 2 places.
2
J-5H51