Outback Power Systems GFX1548 User Manual
Installation
34
900-0113-01-00 Rev A
Functional Test
Once the mounting, wiring, and other installation steps are completed, proceed to the GFX Series
Operator’s Manual. The Operator’s Manual has steps for powering up and performing a functional test
on the inverter system, as well as powering down and adding new devices to an existing system.
Operator’s Manual. The Operator’s Manual has steps for powering up and performing a functional test
on the inverter system, as well as powering down and adding new devices to an existing system.
Refer to the system display manual for programming instructions and menus.