3com 900-0387-01 User Manual

Page of 28
 
 V6000 Analog Integrated Branch Office Solution Installation Guide 
 
9
C
HAPTER 
1:
  
Q
UICK 
S
TART
 
This Guide takes you through the briefest steps that are required for setting up your V6000 
for the first time and making a basic call. For more details on how to use the gateway’s full 
capability, refer to the V6000 User Manual. 
Follow these required steps to set up the V6000. 
1  Unpack the V6000. 
2  Mount the V6000. 
3  Cable the V6000. 
4  Assign the V6000 IP address. 
5  Configure the V6000 ports. 
6  Configure the internal routing table. 
7  Make a call.