SharkRack 42U User Manual

Page of 46
SharkRack Enclosure Installation Guide 
ID-00210-000 
REV D, ECO2773 
Page 27 of 46 
 
Installing a Grounding Kit 
 
Step Detail 
Grounding points are provided on the various cabinet 
components so that each component can be electrically 
bonded to the frame. 
Detail A:  
Shows how to route the grounding cables through the 
frame of the cabinet.  Connection (1) attaches to either of 
the door assemblies.  Connection (2) attaches to the side 
panel 
 
Detail B: 
Shows where connection (2) attaches to the corner of the 
Side Panel 
 
Detail C: 
Shows how to route the grounding cable to the top panel. 
 
Detail D: 
Shows the door grounding cable being routed through the 
face of the corner post (reverse side of Detail A). 
 
 
Figure 27 
Grounding Points 
42U X 37DP Cabinet Shown