Test-Um NT955 User Manual

Page of 97
91
Test-Um NT955 Series
7. Uploading/Downloading Jobs
7.1. Uploading the Cable Test Schedule to the Validator-NT
Open the 
My Documents folder on your desktop.  Right click the Plan-
Um job you want to transfer, and select 
Copy
Power the Validator on. Open the 
My Computer folder on your desktop. 
Plug the USB cord into the USB port on your PC and into the Validator-
NT (Figure 6.1).  As the connection is made, the drive the Validator is 
mapped to (usually Local Disk E:) appears on your desktop and the 
message 
“USB – File I/O Mode” appears in red on the Validator.  
Right click the drive the Validator is connected to and select 
Paste to 
transfer the job file to the compact flash card on the Validator. 
Do not remove the USB cable after this procedure; instead follow the 
instructions below to safely remove the USB cable
On your system tray (lower right side on your desk top), click the USB 
icon to safely remove hardware or Stop Mass Storage Device.  
This completes the upload operation. Remove the USB cable from the 
Validator.  When you remove the USB cable, the power automatically 
turns off on the Validator.
Power the unit on, select Job Manager, and open the job to begin testing. 
After you complete the testing and verification of the cables with the 
Validator, you will download the test results to Plan-Um, populating the 
Length and Results columns on the Cable Test schedule. 
 
Validator
TM
 Uploading/Downloading Jobs