Lucent Technologies 3000 User Manual

Page of 144
Rack Installation
Issue 1 October 1998 
3-17
Before you Power Up the Rack
Introduction
This procedure will detail the necessary steps to perform
BEFORE bringing the loaded Rack online.
Rack
Checklist
Safety
Checklist
Power Up
q
 
The Rack is secured properly.
q
 
The power cord is connected.
q
 
Rack position “Card 0” contains the latest Switch Card
(Model 3100) loaded.
q
 
The appropriate 50-pin female connectors are
connected to the Rack backplane and wired to the
DEFINITY ECS and PSTN.
IMPORTANT SAFETY INSTRUCTIONS
q
 
Do not install this product near water, for example, in
a wet basement location.
q
 
Do not overload wall outlets, as this can result in the
risk of fire or electrical shock.
q
 
Do not attach the power supply cord to building
surfaces. Do not allow anything to rest on the power
cord. Do not locate this product where the cord  will
be abused by persons walking on it.
q
 
Do not operate the system if chemical gas leakage is
suspected in the area. Use telephones located in some
other safe area to report the trouble.
If the above checklist is OK, plug the Rack into the AC
outlet.