Enterasys Networks X16-C User Manual

Page of 94
Optional Cable Management Kit
3-38 Matrix X16-C Chassis Setup
Installing the Optional Cable Management Kit
To install the Cable Management Kit, proceed as follows:
1.
Unpack the top and bottom cable management assemblies from the shipping box. Examine 
each assembly. If either assembly is damaged, contact Enterasys Networks for instructions.
2.
Remove one or both of the chassis bezels (panels with logo) by loosening the two captive 
screws attaching each bezel to the chassis. See 
, which shows the location of the 
two captive screws on the bottom chassis bezel.
3.
Replace the removed chassis bezel or bezels with one or both cable management assemblies. 
Attach each assembly to the chassis by tightening the two captive screws on the base panel of 
the assembly.
Note: The cable management assemblies must be removed to install fan trays. 
Note: Removing both chassis bezels is not required. Installing only one of the cable management 
assemblies may be sufficient to bundle and secure your cables.