Enterasys Networks 2G4082-25 User Manual

Page of 58
Installing Module into Matrix E7 or N7 Chassis
3-4 Installation
4.
Refer to the Caution note above, then rotate the two levers into the closed position.
5.
If the chassis in which the module is installed was powered down for the installation, turn the 
power supplies on. Check to see that the module CPU LED settles at solid green after a few 
minutes. If the LED does not turn solid green, refer to 
 for troubleshooting details. 
Figure 3-1  Installing Module into Matrix E7 or Matrix N7 Chassis (E7 shown)
Caution: In step 4, do not force the locking levers to the point that they touch the face of the front 
panel. Forcing the locking levers to this point could damage the module and chassis.
Precaución: En el paso 4, tenga cuidado de no llevar las palancas de cierre a un punto en donde 
estén en contacto con el panel frontal. Si lo hace, podría dañar el módulo y/o el chasis.
Caution: When setting the locking levers to the closed position, do not try to force the locking levers 
to the point that they touch the face of the front panel. Forcing the locking levers to this point could 
damage the module and chassis.
Precaución: Al mover las palancas a la posición de cerrado, tenga cuidado de no llevarlas a un 
punto en donde estén en contacto con el panel frontal. Si lo hace, podría dañar el módulo o el 
chasis.
1
Card guides
5
Upper/lower locking tabs (in proper open position)
2
Slot number 1 (Left-most slot is 1.)
6
Upper/lower locking tab (in closed position)
3
Module card
7
Backplane connectors
4
Metal back panel
1
SERIES
 E7
4
5
6
7
2
3
50/60Hz
LINE
100-125V~12A
200-240V~6A
50/60Hz
LINE
100-125V~12A
200-240V~6A
ACON
1
0
POWER
FAN
PS1
50/60Hz
LINE
100-125V~12A
200-240V~6A
50/60Hz
LINE
100-125V~12A
200-240V~6A
ACON
1
0
POWER
FAN
PS2
COM
OFFLINE/
RESET
MGMT
CPU
1
2
GROUP
SELECT
1X
11X
13X
12X
14X
23X
G
R
O
U
P
1
24X
G
R
O
U
P
2
GROUP
1
2
3
4
5
6
7
8
9
10
11
12
DFE
2G4082-25
Gb ENET
Æ
Å
Å
Á
Ã
Â
À
Ä
Ä