Schneider Electric E4800 User Manual

Page of 48
PowerLogic
TM 
EM4800 Series
 930-110-01-B.00
Installation 
04/2011
© 201
 Schneider Electric All Rights Reserved
14
To install the control voltage cable in a 208Y/120V or 120/240V application:
NOTE: If the circuit breaker panel does not designate phase A, 
phase B and phase C feeds, make your own designation and use it for 
the rest of the installation. 
1.
Before connecting the sense voltages, turn off the power to the circuit 
being connected. 
2.
Always use a properly rated voltage sensing device to confirm power is 
off.
3.
Connect the sense voltages phase A, B, C, and N leads from the 
voltage disconnect to the meter as described in Figure 6 on page 15 
and Figure 7 on page 16.
NOTE: The phase wiring sequence A, B, C between the PowerLogic 
EM4800 meter and the panel must match or the measurement 
readings will be wrong.
4.
If more than one meter is being installed, repeat this procedure for each 
additional meter.
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH 
Apply appropriate personal protective equipment (PPE) and follow 
safe electrical work practices. See NFPA 70E.
This equipment must only be installed and serviced by qualified 
electrical personnel.
Turn off all power supplying this equipment before working on or 
inside equipment.
Always use a properly rated voltage sensing device to confirm 
power is off.
Replace all devices, doors and covers before turning on power to 
this equipment.
The meters must be connected to the sense voltage and control 
voltage through a properly rated voltage disconnect (not shown in 
the wiring diagrams).
Failure to follow these instructions will result in death or serious
injury.