Emerson Series 600 User Manual

Page of 168
UPS Interconnection Kits
88
Appendix A.2.2
Status/Control Connections - Liebert Series 610/600T/600 UPS Interconnection Kit
The status/control interface is the Status/Control Terminal Block. The connection of the Status/Con-
manually operated circuit breakerRefer to this drawing to ensure that proper connections are 
performed. In case multiple Liebert FS units are connected to the same UPS DC bus, refer to Figure 
610 UPS module to perform the Status/Control connections between each Liebert FS.
This interconnection kit includes Status/Control Connections that enable transfer of signals between 
the Liebert FS system(s) and the UPS system such as:
• Circuit breaker status (closed/open); and
• Undervoltage relay coil excitation voltage.
Figure 98 Liebert Series 610/600T/600 status/control terminal block wiring
The recommended gauge for Status/Control connection wires is 16 AWG - 600VDC (1.3mm
2
 wire sec-
tion). Wire size and installation must comply with all applicable local, regional and national regula-
tions (e.g., National Electric Code for USA).
Appendix A.2.3 UPS Configuration - Liebert FS and Liebert Series 610, 600T or 600
To optimize the integration between the Liebert Series 610/600T/600 UPS system and the Liebert FS, 
some parameters must be checked on the UPS system:
• The UPS rectifier walk-in time must be set as short as possible. Contact your Liebert representa-
tive if your unit has received the upgraded board that enables the setting of “rectifier walk-in 
time” lower than standard.
• Ensure that the “auto battery self test” has either been disabled or upgraded to accommodate 
Liebert FS integration.
4
2
3
5
7
8
9
6
1
10
B
l
u
e
Yellow/
Blue
Y
e
l
l
o
w
Two rows
Row for
installation of 
contractor wire 
connections
B
r
o
w
n
B
r
o
w
n