Emerson 30-200kVA User Manual
![Emerson](https://files.manualsbrain.com/attachments/1ef3aaad462e024fde6cecf537a4c6c781334d44/common/fit/150/50/6dab323528eefa0342baa74a10c15551c3b956250cf9d62f2117dcdf42a7/brand_logo.jpeg)
Installation Drawings
58
Figure 43 Cable terminal layout—30-40kVA NX
1) Main (Rectifier) connections (N1-U1-V1-W1)
2) Bypass connections (N1-U3-V3-W3)
3) Output connections (N2-U2-V2-W2)
4) Battery connections (+/-)
4.1 > to internal battery
4.2 > to external battery
5) Earth
Note 1: For split Bypass operation ensure that the
busbars (*) between Bypass and Rectifier input
are removed.
All dimensions are in mm.
2) Bypass connections (N1-U3-V3-W3)
3) Output connections (N2-U2-V2-W2)
4) Battery connections (+/-)
4.1 > to internal battery
4.2 > to external battery
5) Earth
Note 1: For split Bypass operation ensure that the
busbars (*) between Bypass and Rectifier input
are removed.
All dimensions are in mm.
348
323
299
258