MGE UPS Systems EX 11 RT 3:1 User Manual

Page of 38
Page 24 - 
34007724EN/AA
BY
PASS
NORMAL
N
L
N
L
OUTPUT
INPUT
2. Installation
Connection of battery cables
1 - Check that the battery circuit breaker  12
is OFF ("0" position),
2 - Connect the battery power cable  28  to
the connectors   6   of the power and battery
modules,
3 - Connect the battery detection cable  29
to the connectors   4   of the power and
battery modules,
28
6
4
29
Connection of galvanic isolation transformer
 Output cable cross-section (not provided): 10 mm
2
, solid or stranded wire (maximum 13 mm
2
 or AWG 6).
 Input cable cross-section (not provided): 10 mm
2
, solid or stranded wire (maximum 13 mm
2
 or AWG 6).
Transformer Input
Transformer Output
12