Intel 7xx Servers User Manual

Page of 368
2.11  Migration from Traditional Models
This section describes a suggested methodology  to determine which server model is appropriate to
contain the interactive workload of a traditional model when a migration of a workload is occurring.  
It is assumed that the server model will have both interactive and client/server workloads. 
To get the same performance and response time, from a CPU perspective, the interactive CPU utilization
of the current traditional model must be known. Traditional CPU utilization can be determined in a
number of ways. One way is to sum up the CPU utilization for interactive jobs shown on the Work with
Active Jobs (WRKACTJOB) command. 
***************************************************************************
                             Work with Active Jobs 
                                                                
 CPU %:   33.0     Elapsed time:   00:00:00     Active jobs:   152
 Type options, press Enter.
   2=Change   3=Hold   4=End   5=Work with   6=Release   7=Display message
   8=Work with spooled files   13=Disconnect ...
 Opt  Subsystem/Job  User        Type  CPU %  Function        Status
 __   BATCH          QSYS        SBS       0                  DEQW
 __   QCMN           QSYS        SBS       0                  DEQW
 __   QCTL           QSYS        SBS       0                  DEQW
 __     QSYSSCD      QPGMR       BCH       0  PGM-QEZSCNEP    EVTW
 __   QINTER         QSYS        SBS       0                  DEQW
 __     DSP05        TESTER      INT     0.2  PGM-BUPMENUNE   DSPW
 __     QPADEV0021   TEST01      INT     0.7  CMD-WRKACTJOB   RUN
 __   QSERVER        QSYS        SBS       0                  DEQW
 __     QPWFSERVSD   QUSER       BCH       0                  SELW
 __     QPWFSERVS0   QUSER       PJ        0                  DEQW
**************************************************************************
(Calculate the average of the CPU  utilization for all job types "INT" for the desired time interval for
interactive CPU utilization - "P" in the formula shown below.)
Another method is to run Collection Services during selected time periods and review the first page of the
Performance Tools for iSeries licensed program Component Report. The following is an example of this
section of the report:
IBM i 6.1 Performance Capabilities Reference - January/April/October 2008
©
 Copyright IBM Corp. 2008
 Chapter 2 - Server Performance Behavior
32