MGE UPS Systems 100 User Manual

Page of 30
34003602EN/AB
 - Page 23
Settings
JBUS / RS485
PowerServices T
e
lPac
UPS
CD
Phone
A
 5V B R+ R- T+ T
-
< 4m
Settings
JBUS / RS485
PowerServices T
e
lPac
UPS
CD
Phone
A
 5V B R+ R- T+ T
-
U-Talk
Settings
JBUS / RS485
PowerServices T
e
lPac
UPS
CD
Phone
A
 5V B R+ R- T+ T
-
2. Installation
2.7 Installing the PowerServices TelPac card
N.B.: For Galaxy PW UPSs, first attach the cover plate provided in
the pack.
Installation
 (Illustrations show the Pulsar EXtreme UPS)
It is not necessary to shut down the UPS.
 Unscrew and remove the cover plate of one of the free
communication card slots in the UPS.
 Insert the card and secure it using the screws.
Check the indicator lights 
(see section 1.5 "Indicator lights")
 Check the status of the UPS indicator light  10 :
- on steady for 5s (status 1 in the table),
- then regular flashing every second during the start-up phase
(status 3 in the table),
- lastly, random flashing during data exchange with the UPS (status
4 in the table).
 Check the status of the CD indicator light   9  :
- off for 5s,
- then flashing during the start-up phase (status 3 in the table),
- lastly, off (status 2 in the table).
Connection
 Connect the telephone cable to the card’s phone port on one end
and the telephone outlet on the other. If the wall outlet is not
compatible with the connector proposed on the cable, use an
adapter.
Installation is now complete. PowerServices TelPac is operational.
Move on to stage 2 (see section 2.1 "Procedure").
10
ASI
ASI
ASI
9