MGE UPS Systems 1100 Tower User Manual

Page of 36
Pb
  Hertz     50/60 Hz
W/VA    1000W/1440VA
Ausg
  Hertz     50/60 Hz
 Amps    12A MAX
Netz
Util
Load
Mains
Reseau
Volt       120V~1O
Volt       120V~1O
36Vdc, 9Ah
U.S. PAT. NO.  6,094,363
Programmable
2
1
Vac OUT  
I max 12A
U.P.S.
34Z5
R
Vac IN
SITE WIRING
FAULT
Data line protection
T20A/125V~
RS232
344-50254-00
IN
OUT
1 - Remove the power cord supplying the
equipment to be protected.
2 - Connect the power cord to the AC-power
wall receptacle  8  .
3 - Connect the protected equipment to the
UPS using the cord  20 .  Connect critical
loads to the two standard receptacles 5  and
any non-critical loads to the two program-
mable receptacles  6   (1 and 2).
If the UPS is connected to a 
computer running MGE communi-
cations software, it is possible to
program the interruption of power
to the programmable receptacles
6  during operation on battery
power, thus reserving backup
power for the critical loads.
4 - Lock the connections using the securing
system  26  (for rack models only).
3400723200/AC
- Page 15
2.3 Connecting the protected equipment
Check that the indications on the rating plate on the back of the UPS correspond to your AC-power system and to
the actual electrical consumption of all the equipment to be connected to the UPS.
2. Installation
8
As soon as the UPS is energized, the battery begins charging. Eight hours are required to charge to the full rated
backup time.
20
5
A Pulsar Evolution 1500 tower UPS has been used below to illustrate the instructions. The principle is the same for all the
other tower and rack models.
6
1
2