MGE UPS Systems 1100 Tower User Manual

Page of 36
3400723200/AC
- Page 23
P U L S A R
Evolution
1 1 0 0
B
A
C
4.2 Replacement of the battery module
4. Maintenance
Removal of the battery module
When replacing batteries, use the Battery Replacement Chart below to determine the correct battery.
This operation may be carried out with the UPS supplying power to the load.
Safety rules
Servicing of batteries should be performed or supervised by personnel knowledgeable of batteries and required
precautions.  Keep unauthorized personnel away from batteries.  Batteries constitute a danger (electrical shock,
burns). The short-circuit current may be very high. Precautions must be taken for all handling:
remove all watches, rings, bracelets and any other metal objects;
use tools with insulated handles.
- Unclip the small plate with the MGE
logo on the front panel of the UPS.
- Remove the two screws.
C   - Remove the left-hand side of the front
panel by pulling it slightly up and then for-
ward.
- Disconnect the battery module by
pulling apart the connectors (never pull on
the cables).
Tower models
D
Battery Replacement Chart
Component
Manufacturer
Manufacturer’s 
Catalog Number
6V 7,2A Bat (in 800VA Rack)
Panasonic
LC-R067R2CH1
12V 7,2A Bat (in 800VA Tower)
CSB
GP1272F2
6V 9A Bat (in 1100VA Rack and 500VA)
Panasonic
UP-RW0645CH1
12V 9A Bat (in 1100VA Tower)
CSB
HR1234wF2