MGE UPS Systems 4000 RT User Manual
34008030EN/AA
- Page 12
2. Installation
2.1 Unpacking and contents check
2.2 Internal battery connection (Battery start-up)
(40) Pulsar MX 4000 or 5000 UPS.
(41) Two sets of tower stands.
(42) RS232 communications cable
(43) Product documentation.
(44) 4 cable lockers.
(45) Telescopic rails for rack enclosure with mounting
hardware (optional, or standard with NetPack version).
hardware (optional, or standard with NetPack version).
(46) Screw driver.
(47) Solution-Pac power management suite CD-ROM.
(48) Network Management card (optional, or standard in
NetPack version).
NetPack version).
(49) 4 IEC 10A output cables.
Packaging must be destroyed according to waste management standards. Recycling icons are displayed for easy selection.
A dangerous voltage is present inside the power module and the battery module. Any operations to be carried out
on these modules must be done so by qualified staff.
on these modules must be done so by qualified staff.
1 - Remove the two fixing screws (59) to free
the battery connector.
2 - Push the battery connector so that you can
read
the battery connector.
2 - Push the battery connector so that you can
read
"
Connected
"
.
3 - Secure the two fixing screws (59).
Card Settings
RS232 Download
66074
UPS
data
Reset
100 10
1 2
ON
ETHERNET
RS232
IP=
MAC=00E0D8FF855E
40
41
42
43
44
45
46
48
47
49
60
59