MGE UPS Systems 4000 RT User Manual

Page of 38
34008030EN/AA
 - Page 20
2. Installation
2.8 Connection of IEC cables to output receptacles
 
 
 
1 - Connect the equipments to the UPS using 
the cables (49).
It is preferable to connect the priority 
equipments to the four outlets (2) and the non 
priority equipments to the four outlets (1) that 
can be programmed in pairs (1 and 2).
Connect any high-power devices to the 16 A 
outlet (3)
To program shutdown of outlets (2) during 
operation on battery power and thus optimise 
the available backup time, the MGE UPS 
SYSTEMS communication software is 
required.
2 - Fit the connection securing system (44) 
that prevents the plugs from being pulled out 
accidentally.
 
 
2
1
44
49
3