APC 4000 Leaflet

Page of 2
MGE Galaxy 3000 / 
Galaxy 4000 UPS 
Application Guide
Identify the Opportunity
>  
Is battery backup and power conditioning a must?
>
Is front access a requirement?
>  
Is footprint an issue?
>  
Is scalable power levels important?
>  
Is a versatile/traditional UPS required?
Customer Challenges
>  
How to fit today’s budget, and meet the future power 
needs of the organization.
How to increase battery backup in a small footprint.
>  
How to install and service the equipment when back 
access is not an option.
>  
How to choose when inline and matching 
maintenance bypass and distribution are required.
Key Considerations
48 hour shipment for SKU’d part numbers
>  
Ease of installation
Place application  
image in this space.
[Product/photo captions – Arial 7 point]
Why is APC the right choice for data centers and light 
industrial applications?
>
Ultra high availability topology (UHAT)
>  
Compact footprint when space is an issue (internal batteries)
>  
Internal or external maintenance bypass
Front access only design
Market trends and opportunities for this space
Pay as you grow
>  
Fit the budget you have today
Meet the future needs of your organization
Target Applications & Environments
Data center/medical imaging/motor and industrial loads
>  
Computer or telephone room
Electrical equipment room
Service corridor
>  
Basement