Symmetra MW II 1200 kW 3 x 400/230 V Installation - 990-1979E-001
Top cable entry
1. Loosen the 8 bolts to remove top cover. 
Note: No drilling or cutting should take place over the top of the UPS.
2. Drill holes for grommets. 
3. Re-fit the covers and install the grommets.
4. Feed the cables through the grommets. Connect cables at cable connection points.
5. Connect Protective Earth conductor to busbar locations.
~
~
Normal
UPS Summary
Normal
X022
X021
X007
X010
X011
X008B
X008A
X012
X013
X014A
X014B
X017
X405
 L1  IN
 L2  IN
 L3  IN
 L1  OUT
 L2  OUT
 L3  OUT
L3 IN
L3 OUT
L2 IN
L2 OUT
L1 IN
L1 OUT
Top view of top cover
Top view of input and output
Side view of PE 
busbar
.