APC Power Supply User Manual

Page of 46
36
InfraStruXure Site Planning, Installation, Start-Up
How to Ensure Total Power Off 
1. Open (turn OFF) the main circuit breaker 
on the power source feeding the PDU.
2. Open (turn OFF) the main input switch on 
the PDU.
3. Set the Main Output circuit breaker on the 
front of the PDU to OFF.