APC NBRK0200 User Manual

Page of 36
NetBotz Rack Monitor 200 Installation and Quick Configuration Manual
6
How to Install the Rack Monitor 200
Note: Install the Rack Monitor 200 in an environment compatible with the environmental 
specifications on page 23.
Note: When you install the Rack Monitor 200 in the rack, do not create a hazardous 
condition due to uneven mechanical loading. For example, do not use the Rack Monitor 200 
as a shelf.
You can install the Rack Monitor 200 in the front or the rear of the rack using the rack-mount option, 
which requires 1 U of rack space. If using an APC NetShelter
®
 VX or SX rack, you also have the option 
to use the toolless peg-mounts, which do not use any U-spaces.
Toolless peg-mount installation
Note: The toolless peg-mount installation is only available with a NetShelter VX or SX rack 
or enclosure.
Caution: To avoid equipment damage, use only the hardware provided when installing the 
power cord retainer bracket.
1. Install the power cord retainer bracket as shown.
2. In the left or right cable channel in the rear panel of the 
enclosure, install the Rack Monitor 200 in a set of mounting 
holes. Be sure to push down until it locks.
8-32 x 1/4-in Phillips-head screws
Power cord retainer bracket