APC VT User Manual

Page of 44
Operation – Operation Procedures
990-2282A-001
Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation
19
How to perform a restart 
Restart – single system wihout external MBP. 
Set the utility/mains breaker to the 
ON
 position.
If your installation includes an XR Battery Enclosure (SUVTBXR2B6S/SUVTBXR6B6S) with a 
DC disconnect switch, set the DC disconnect switch to the 
ON
 position.
After system boot-up, the display will automatically ask you to confirm/select voltage and frequency as 
shown in the following.
Voltage confirmation. 
At restart, the display will prompt you through the following screens:
Warning
Only trained personnel familiar with the construction and the equipment may  
restart the UPS.
Note
Wait approximately 30 seconds for the system to boot up and carry out a self test.
When the Confirm Voltage prompt appears on 
the screen, go to the desired voltage using the 
UP/
DOWN 
keys and press 
ENTER
.
When the prompt Apply load appears, go to Yes 
using the 
UP/DOWN
 keys and press 
ENTER
 if you 
want the UPS to provide a load output now. (If 
you do not want UPS load output at this point, go 
to No).
The green (
LOAD ON
) LED is now lit. Press 
ESC
 
two times and the display will show the above 
Overview Screen.
Note
The UPS is now ready to support the load.
Confirm Voltage
Use 400V
Yes, use 400V
No, select another
Use
Press
Apply load? 
Yes
No
Use
Press
Chrg xxx% ||||||||||
Load xxx% ||||||||||
xxx Vin xxxVout xxHz
Run-time: xxhr xxmin