APC RT SURTA48XLBP User Manual

Page of 12
Pre-installation Procedure
2
Smart-UPS RT SURTA48XLBP/SURTA48XLBPJ External Battery Pack User Manual
4. Place the battery pack where it will be used.
– Ensure that air vents on the front and rear of the unit are not blocked.
– Do not operate the battery pack where there is excessive dust or the temperature or humidity 
are outside the specified limits.
Pre-installation Procedure
1. Once the battery pack is at the installation site, remove the top cover  and battery modules  
to lighten the load and prepare the battery pack to be installed in a tower or rack-mount 
configuration. 
2. To disengage the battery from the chassis, push the battery tabs  inward.
3. Go to the installation procedures to install the UPS and battery pack as a tower  (page 3) or in a 
rack-mount  (page 5) configuration. 
2.5
cm
2.5
cm
40°C
104°F 
0%
 
95%