APC 15000 RAID User Manual

Page of 152
Controller Installation
12 
007-5510-002
2.2 Unpacking the System
Before you unpack your controller, inspect the shipping container(s) for damage. If you detect damage, 
report it to your carrier immediately. Retain all boxes and packing materials in case you need to store or 
ship the system in the future. 
While removing the components from their boxes/containers, inspect the controller chassis and all 
components for signs of damage. If you detect any problems, contact SGI immediately.
Your controller ships with the following: 
• controller chassis
• two (2) power cords
• RS-232 and Ethernet cables for monitoring and configuration 
• cover panel and rack-mounting hardware 
2.2.1
Rack-Mounting the Controller Chassis 
For instructions on mounting the controller in the rack, contact your service provider.
2.2.2
Connecting the Controller in Dual Mode 
For dual mode configuration only: 
1.
Connect the LINK ports on the two controller units using the supplied cable. 
2.
Connect the COM ports on the two units using the supplied cable. 
 Wear an ESD wrist strap or otherwise ground yourself when handling controller 
modules and components. Electrostatic discharge can damage the circuit boards.
!
Warning