Completing the Installation
2H28-08R SmartSwitch 2208 User’s Guide
3-15
4.
Verify that a link exists by checking that the port RX LED is on 
(flashing amber, blinking green, or solid green). If the RX LED is off 
and the TX LED is not blinking amber, perform the following steps 
until the RX LED is on:
a.
Check that the power is turned on for the device at the other end of 
the link.
b.
Verify proper crossover of fiber strands between the applicable 
port on the 2H28-08R and the fiber optic device at the other end 
of the fiber optic link segment.
c.
Verify that the fiber connection meets the dB loss specifications 
outlined in Cabletron Systems Cabling Guide.
If a link has not been established, see 
, before 
contacting the Cabletron Systems Global Call Center. Refer to 
3.6
COMPLETING THE INSTALLATION
After installing the 2H28-08R and any optional Fast Ethernet Interface 
Modules, and making the connections to the network, secure the cables 
by running the cables along the strain-relief bracket and tying them to the 
strain-relief bracket using cable ties. 
The 2H28-08R is now ready to be set up through Local Management. 
Refer to 
access and use Local Management to configure the 2H28-08R.