Fujitsu BX600 S3 User Manual

Page of 164
96
Operating Manual
 BX600 
S3
Installing an I/O Blade
Ethernet I/O Blades
©
 c
ogn
it
a
s
G
e
s
e
lls
c
h
ft
 f
ü
r T
e
c
h
ni
k
-D
o
k
u
m
e
n
ta
ti
on m
b
H
 20
09 
P
fad
H
:\
A
p
ri
l\
P
R
IM
E
R
GY
_R
eb
rand
in
g
\v
o
n W
a
lt
er
\b
x
600
_s
3_
ba\
B
X
6
0
0
S
3
_
e
n
\b
la
d
e
-u
s.
k0
8
8.10
Installing an I/O Blade
V
CAUTION!
Read the safety information and the information on handling electro-
static-sensitive components in the 
I/O blades must always be installed in slots NET1 and NET3 first (see 
).
Removing the Dummy Module
All unoccupied slots in the basic unit are fitted with dummy modules to ensure 
that the electromagnetic emission properties of the system are observed and 
that the system components are properly cooled.
If you wish to install an I/O blade, you must first remove the dummy module from 
the corresponding slot.
Figure 45: Unlocking the handle
Ê
Press the spring (1) on the underside of the handle (a) to unlock it.