Fujitsu 2000 SERIES User Manual

Page of 285
CHAPTER 8 Chapter System Startup/Shutdown and Power Control 
8.1 Power On and Power Off the Whole System 
157 
 
C122-E175-01EN 
 
 
 Chapter System 
CHAPTER 8
Startup/Shutdown and Power Control 
This section describes the startup, shutdown and the power control in PRIMEQUEST 2000 series. 
8.1 
Power On and Power Off the Whole System 
This section describes the power on and power off operations which are supported by the system. 
The power control of the whole system is operated from the [System Power Control] window of the MMB. 
FIGURE 8.1
 [System
 Power Control
] window 
 
For details on the [System Power Control] window, see “1.2.8 [System Power Control] window in 
“PRIMEQUEST 2000 series Tool Reference” (C122-E177) 
8.2 
Partition Power on and Power off 
This section describes various procedures of power on and Power off for the partition and explains the 
method of checking power supply. 
8.2.1  Various Methods for Powering On the Partition 
There are three methods for powering on the partition, which are as follows.  
1.  Operation through the MMB Web-UI or MMB CLI.  
The partition can be powered on through the MMB Web-U or MMB CLI operation. In this method, power 
on can be specified for all the partitions or specified in the partition unit. 
2.  Scheduled operation (Automatic operation according to a set schedule) 
A partition can be powered on by a scheduled operation (Automatic operation function). A partition unit 
can be powered on automatically by recording the time of power on in advance by the scheduled 
operation function.