Fujitsu Cloud Edition V3.1.0 User Manual

Page of 399
Operation
The methods for operating physical servers after usage changes are as follow.
Perform the procedure before performing any operations.
-
When using multiple L-Servers, switching between them, on a single physical server
Usage can be changed by repeating the following procedure.
1.
Confirm the Physical Servers to Use
2.
Stop the Source L-Server for Usage Change
Stop L-Servers operating on physical servers which are required for change usage.
For details, refer to "
".
3.
Start the Destination L-Server for Usage Change
After changing the configuration, the L-Server before changing cannot be operated, until the new L-Server has finished starting.
-
When using multiple L-Servers, switching between them, on unused physical servers in a server pool
Usage can be changed by repeating the following procedure.
1.
Confirm the Server Pool
Confirm whether an unused physical server exists in the server pool.
2.
Start the Destination L-Server for Usage Change
After changing the configuration, the L-Server before changing cannot be operated, until the new L-Server has finished starting.
17.9.2 Operation
The methods for operating physical servers after usage changes are as follow.
-
When using multiple L-Servers, switching between them, on a single physical server
Usage can be changed by repeating the following procedure.
1.
Stop the Source L-Server for Usage Change
Stop L-Servers operating on physical servers which are required for change usage.
For details, refer to "
".
2.
Start the Destination L-Server for Usage Change
After changing the configuration, the L-Server before changing cannot be operated, until the new L-Server has finished starting.
-
When using multiple L-Servers, switching between them, on unused physical servers in a server pool
Usage can be changed by repeating the following procedure.
1.
Confirm the Server Pool
Confirm whether an unused physical server exists in the server pool.
2.
Start the Destination L-Server for Usage Change
Start the destination L-Server for usage change.
For details, refer to "
After changing the configuration, the L-Server before changing cannot be operated, until the new L-Server has finished starting.
 
- 226 -