Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
What’s New in Release 8.2r 
xiii
 
Upgrade tips
The following upgrade tips were generated from problems identified in the 
laboratory or during early introduction.
Adding a third memory circuit pack and an optical drive requires a second 
non-call-preserving service interruption. Se
.
When upgrading a DEFINITY ECS R8r to a duplicated system (B carrier) 
or adding a switch node carrier (D carrier), you may receive a carrier that 
looks different than the ones currently installed. The enhanced carriers 
come with 16 grounding straps that connect to the carrier connector 
panel. See 
,  and 
.
NOTE:
An enhanced carrier is used only in an R8r PPN cabinet that uses 
either AC power (U.S.) or Global power.
Cautions and warnings
The following new cautions and warnings were generated from problems 
affecting possible data loss that were identified in the laboratory or during early 
introduction. 
Procedure
Caution or Warning
!
CAUTION:
Allow 10 minutes after unlocking to make sure the standby 
SPE has fully returned to service.
!
CAUTION:
All calls are dropped—this is a service interruption