Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
G3vs with Intel 386 or Risc Processor to R8r 
4-16
Upgrade Completion 
4
Upgrade Completion
Install Remaining Hardware and Administer the 
System
1. If the present system was removed to make room for the Release 8r 
cabinet, skip to Step 3.
2. If the Release 8r cabinet was installed while the present system is in 
service, return to 
. Return to 
this section when finished.
3. Connect all new and reusable I/O cables to the Release 8r cabinet. 
Cross-connect at the MDF as required.
4. Remove all reusable circuit packs from the present system and install into 
the Release 8r cabinet. Install any new circuit packs into the Release 8r 
cabinet.
5. Install fiber optic cables and administer the fiber links as needed. Refer to 
DEFINITY Enterprise Communications Server Release 8 Installation and 
Test for Multicarrier Cabinets.
6. Administer any new translations, as required.
Enable TTI
1. Type change system-parameters features and press 
Enter
.
2. On the second screen, set the 
Enabled?
 field to y to activate the TTI 
feature.
Check Link Status
1. Type display communication-interface links and press 
Enter
. Compare it 
with the earlier status.
2. Type status link 
number and press 
Enter
. Repeat this step for each link.
Enable Scheduled Maintenance
1. Type change system-parameters maintenance and press 
Enter
. Use this 
screen to enable scheduled daily maintenance.
Resolve Alarms
1. Examine the alarm log. Resolve any alarms using 
DEFINITY Enterprise 
Communications Server Release 8 Maintenance for R8r.