Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-9
Read This First 
5
Save Translations
1. Log in at the Manager II on the G2.
2. Type rtx (run tape, execute) and press 
Enter
. This instructs the system to 
write all translation information from memory to the tape.
3. Remove the system tape and install the backup tape.
4. Type rtx and press 
Enter
.
Make Source Tape for TRACS Report
A spare G2 tape must be acquired from the remediation before performing the 
following steps. For each processor, there must always be 2 tapes on site with 
the G2 system. Do not send a system or backup tape to STS. After performing 
the previous procedures, copy the G2 translations to the spare tape used to 
make the TRACS report. 
1. Remove the backup tape and install the spare tape.
2. Type rtx and press 
Enter
. This command instructs the system to write all 
translation information from memory to the tape.
3. Remove the source tape.
4. Insert the system tape.
5. Mail the source tape (next-day delivery) to STS for use in making the G2 
TRACS report.
System Upgrades
There are many configurations of DEFINITY G2 in the field. Each system can 
have a unique configuration. However, to simplify Release 8 upgrades:
The existing common control is always replaced by a multicarrier PPN
Existing traditional modules are replaced by EPNs 
Existing universal modules are upgraded to EPNs
A new multicarrier cabinet would then always serve as the PPN. If a G2 universal 
module is upgraded to a DEFINITY ECS Release 8 EPN, hardware changes 
(including carrier replacement) are required.