Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-71
High Reliability 
5
Set Additional Administration
1. Type list configuration software-version long and press 
Enter 
to 
compare the version number of the DEFINITY ECS Release 8 software 
program with the version number (written on a label on the processor’s 
faceplate). If the version numbers are not the same, change the version 
number on the processor label so that they agree.
2. Type change system-parameters customer-options and press 
Enter
Use this screen to enable the Release 8 option and to assign the 
customer’s other right-to-use options on the G2-to-DEFINITY ECS Release 
8 upgrade order. See 
DEFINITY Enterprise Communications Server 
Release 8 Administrator’s Guide, for details on enabling these options.
3. Type change site-data and press 
Enter
. Use this screen to assign 
system-specific information (such as building, floor, stations, and so 
forth).
4. Type status system 1 and press 
Enter 
to verify the system is in the 
“active/standby” mode.
5. Type save translation and press 
Enter
. This instructs the system to write all 
translation information from memory to the translation card.
!
WARNING:
If the terminal screen displays “translation corruption detected; call 
Lucent Technologies distributor immediately”, an error was detected 
in the translations.
Reconnect Cables
1. At the power distribution unit of the upgraded EPN, set the main circuit 
breaker to OFF.
NOTE:
Powering down an EPN without powering down the PPN will set off 
alarms. However, these alarms should clear after power is restored 
to each EPN.
2. Temporarily disconnect the lightwave transceivers and fiber optic cables, 
already labeled, from the appropriate carriers.
3. Replace the back doors or back panels.
4. At the EPN cabinet, reconnect the lightwave transceivers, fiber optic 
cables, and the connector cables associated with the carrier being 
replaced.
5. Install the front door on the EPN cabinet.