Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-28
Install a New EPN Cabinet in an Existing System 
6
Figure 6-15.
Switch-Connected Release 8r with SNC in EPN
Switch-Connect New EPN to Existing PPN and
EPN (High Reliability)
For the following connection example, the PPN cabinet is called Cabinet 1, the 
first EPN cabinet is called Cabinet 2, and the EPN cabinet containing the Switch 
Node Carrier is called Cabinet 4.
NOTE:
For the following example, add links to PNs in alternating order, for 
example: 20 and 2, 19 and 3, 18 and 4, and so forth.
Figure Notes:
1. Cabinet 1 (PPN)
2. Cabinet 4 (MCC EPN with One Switch 
Node)
3. Cabinet 2, 3, and 5 through 16 
(MCC or SCC EPNs)