Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-100
Add a Switch Node Carrier (Standard Reliability) 
6
Install New Switch Node Carrier 
1. Install the switch node carrier into position “D” by lining up the plastic 
alignment tips on the top rear of the carrier with the screw holes in the 
cabinet. These alignment tips support the carrier while the screws are 
being replaced. Ensure that the power cords are properly placed in the 
slots at the sides of the carrier.
2. Fasten the carrier into position with 4 self-tapping screws.
!
CAUTION:
Carefully realign the threads on the self-tapping screws by turning 
them clockwise 1 turn before tightening them to avoid stripping the 
threads out of the framework.
3. Behind the carrier, replace the 2 screws saved from the removal of the old 
carrier.
4. Connect the “P1” (small) connector to the “D” carrier. If necessary, to get 
enough slack in the cables, cut the tie wrap holding the intercabinet cable 
from the upright in the area being installed. Snap the connector lock into 
place to ensure the connection is properly made.
5. Connect the 8 ground straps from either the “A” carrier or the enhanced 
fan unit to the new "D" carrier. See 
. These straps were left 
connected when the old “D” carrier was removed.
6. Connect the 8 ground straps from the “E” carrier (if installed) to the new 
“D” carrier. See 
. These straps were left connected to the “E” 
carrier when the old “D” carrier was removed.
7. For a standard AC-powered control carrier, install the 4 carrier ground 
straps. The straps connect ground points G1 and G8 from the top of the 
B-carrier backplane to the B-carrier connector panel  bracket and ground 
points G9 and G16 from the bottom of the B-carrier backplane to the 
B-carrier connector panel  bracket. 
For an enhanced carrier, install the 16 carrier-ground straps. The straps 
connect ground points G1 through G8 from the top of the B-carrier 
backplane to the B-carrier connector panel  and ground points G9 through 
G16 from the bottom of the B-carrier backplane to the B-carrier connector 
panel . Use the 8 screws to connect the ground straps to the connector 
panel  (see 
NOTE:
An enhanced carrier is used only in an R8r PPN cabinet that uses 
either AC power (U.S.) or Global power.
NOTE:
DC-powered cabinets DO NOT use any of the above carrier-ground 
straps.