Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Upgrading R5si/R6si to R8r EPN and Adding Memory 
3-20
Release 5/6si to Release 8r 
3
Connect TDM/LAN Cables and ICC Cables
1. Route and connect the TDM/LAN cables. If any of the Release 5/6si port 
cabinets (being upgraded to Release 8r cabinets) were originally R1V3 
port cabinets, use the following steps to route a cable between an R1V3 
upper cabinet and cabinet beneath it. Do not run a new cable through the 
existing slot in the rear shelf of the upper cabinet.
a. Loosen the 2 left connector panel screws, then remove the other 2 
connector panel screws.
b. Attach the TDM/LAN cable to the backplane and slide the cable 
between the connector panel and the rear shelf (not through the 
existing slot in the shelf). Route the cable along the bottom of the 
cabinet.
c. Replace and tighten the connector panel screws.
2. For a critical reliability system, connect the ICC cables as shown in 
, and 
NOTE:
For a duplicated cabinet, do not use the ICC cables (H600-259 G1) 
removed from the duplicated Release 5/6si PPN. Use the new ICC 
cables (H600-248 G1) supplied with the upgrade.
3. On the “A” carrier, verify the CFY1 current limiter (CURL) connects to 
pinfield block “00” (see 
).
Table 3-4.
Intercabinet Cable Connections
Connect ICC Cables
From
To
Carrier
Pin-Field Block
Carrier
Pin-Field Block
EPN
J58890N
ICCA
J58890H
ICCA
ICCB
ICCB