Franke Consumer Products FGC 904 User Manual

Page of 44
 
 
 
 
EN 
 
1
6
 
16 
INSTALLATION
 
Wall drilling and bracket fixing 
 
 
 
 
 
 
 
 
Wall marking: 
•  Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the 
centre of the area in which the hood will be installed. 
•  Draw a horizontal line at 650 mm above the hob. 
•  Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit align-
ing the centre (notch) with the vertical reference line. 
•  Mark the wall at the centres of the holes in the bracket. 
•   Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the 
upper chimney section supplied), aligning the centre (notch) with the vertical line. 
•   Mark the wall at the centres of the holes in the bracket. 
•   Mark a reference point as indicated at 116 mm from the vertical reference line and 310 mm 
above the horizontal reference line. 
•   Repeat this operation on the other side. 
•   Drill ø 8 mm holes at all the centre points marked. 
•   Insert the wall plugs 11 in the holes. 
•   Fix the lower bracket 7.2.1  using the 12a screws (4,2 x 44,4) supplied. 
•  Fix  the  upper  bracket  7.2.1  and  the  air  outlet  connection  support  7.3  together  using  the  2 
screws 12a (4,2 x 44,4) supplied.  
•   Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap 
of 5-6 mm between the wall and the head of the screw. 
 
 
11
12a
310
X
116
1÷2
116
650 min.
7.2.1