Mitsubishi Electronics 882.00273.00 User Manual

Page of 101
Chapter 5:  Maintenance 
5-1  Preventative Maintenance Schedule 
The mechanical design of the blender is very simple and very little maintenance is required.  
The only moving parts are the metering gates, weigh hopper dump valve, and mixer agitator. 
The checklist below contains a list of items which should be inspected and/or replaced to 
keep your blender operating at peak efficiency.  Perform each inspection at the regular 
intervals listed below. 
Figure 50: Sample Preventative Maintenance Schedule 
System model # 
 
Serial # 
Daily 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect blender for 
any loose parts-
tighten them 
immediately. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Verify quality of 
compressed air 
supply. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Verify mixer door is 
properly latched. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every week 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect metering 
gates for proper 
operation. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Check to make 
sure that all hose 
connections are air 
tight.         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every month 
Jan  Feb  Mar  Apr  May
Jun
Jul 
Aug
Sep  Oct  Nov
Dec
Inspect air regulator 
and air safety 
circuits, if equipped. 
 
 
 
 
 
 
 
 
 
 
 
 
Recalibrate blender 
only If necessary. 
 
 
 
 
 
 
 
 
 
 
 
 
Photocopy this page for your maintenance records 
BF1-615.3 
Chapter 5: 4BMaintenance 
64 of 101