Grindmaster PBIC-430V2E230 User Manual

Page of 44
Shuttle Brewers & Airpot/Shuttle Brewers
Page 21
Troubleshooting (cont.)
Filling Problems
Problem
Possible Causes
Service Check
Remedy
Tank does not refill
• No electrical power to
equipment
• No water supplied to
equipment
• No power to control
board 
• No power to control
board and transformer
not powered.
• No power to control
board and transformer
powered.
• Check for proper 
voltage at terminal 
block. Check circuit
breaker on supply circuit.
• Disconnect water supply
line and ensure that
water is provided to unit.
Check to see that any
and all valves in water
line are open.
• Check for proper voltage 
across transformer 
primary terminals by 
disconnecting terminals.
See wiring diagram for
more information.
• Ensure there is proper
voltage across terminal
block. Check wiring 
diagram for more 
information.
• Disconnect quick 
disconnect on secondary
side of transformer at
quick disconnect
between yellow and blue
wires. Check for 24 Vac
between blue and 
yellow wires.
• Establish electrical power 
to unit.
• Establish water supply
to unit.
• If there is not 120V across 
primary, proceed to step 
entitled “No power to control
board and transformer not
powered.” 
If there is proper
voltage across primary, proceed
to step entitled “No power 
to control board and 
transformer powered”.
• Secure connections and reset
circuit breaker on equipment.
• If there is not 24 Vac between
the blue and yellow wires,
replace transformer. If proper
voltage exists, secure 
connection between 3 pin 
connector and control board.