Grindmaster PBIC-430V2E230 User Manual

Page of 44
Page 22
Shuttle Brewers & Airpot/Shuttle Brewers
Troubleshooting (cont.)
Filling Problems
Problem
Possible Causes
Service Check
Remedy
Tank does not refill
• Fill valve or control
board is faulty
• Check to ensure proper
connection between 
6 pin connector and con-
trol board. Check 
for proper connections
at fill valve terminals.
Drain 1 gal. (3.8L) of
water from hot water
faucet. Check for 24 Vac
across fill valve 
terminals.
• If 6 pin connector is securely
attached to control board and
all connections are secure 
and there is 24 Vac across 
fill valve terminals, replace 
fill valve.
Heating Problems
Problem
Possible Causes
Service Check
Remedy
Tank does not heat
• No electrical power to
equipment
• No power to control
board
• Check for proper voltage
at terminal block. Check
circuit breaker on supply
circuit.
• Check for proper voltage 
across transformer 
primary terminals by 
disconnecting terminals.
See wiring diagram for
more information.
• Establish electrical power 
to unit.
• If there is not proper voltage
across primary, proceed to step 
entitled “No power to control
board and transformer not 
powered”
. If there is proper
voltage across primary, proceed
to step entitled “No power 
to control board and 
transformer powered”.