Lucent Technologies 555-230-128 User Manual

Page of 144
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Compact Modular Cabinets  
555-230-128  
Issue 3
May 1998
Install and Cable the Cabinets 
Page 1-83
Install Multi-point Adapters 
1
Basic Multi-point Installation Distances
Figure 1-38
 provides cabling information for fanout of ISDN-BRI multi-point 
installations. In 
Figure 1-38
, the terminating resistor is located in the satellite 
closet. All distances assume 24 AWG (#5) (0.26 mm
2
) D-Inside Wire (DIW).
Figure 1-38.
Basic Multi-point with One Work Location
Figure Notes
1. S-interface source (TN556)
2. Terminating resistor
3. Satellite closet
4. Maximum distance from 
S-interface source to work location 
(1600 feet) (488 m) 
5. Maximum distance from satellite 
closet to work location (250 feet) 
(76 m)
6. System cabinet 
7. Terminating endpoint 1 
8. Terminating endpoint 2 
9. Work location
10. Maximum distance from information 
outlet to terminating endpoint (33 
feet) (10 m)
11. Information outlet
2
3
8
9
7
1
10
11
11
5
4
6
inst_dis RPY 012098