Mitsubishi Electronics FX3G User Manual

Page of 964
887
FX
3S
/FX
3G
/FX
3GC
/FX
3U
/FX
3UC
 Series
Programming Manual - Basic & Applied Instruction Edition
38 Error Check Method and Error Code List
38.1 States and Colors of LEDs PLC Operation Status
31
FNC277
-F
NC2
79
Da
ta
 
Trans
fer 3
32
FNC28
0-F
NC
289
H
igh-Speed 
Process
ing 2
33
FNC2
90-
FNC299
Ex
tensi
on Fi
le
 
Register C
ontrol
34
FN
C300-
FNC30
5
FX
3U
-C
F-
AD
P
35
SFC
•STL
Programming
36
Interrupt 
Function
37
Sp
ec
ia
l D
evi
ce
38
E
rror Code
A
Ve
rsi
on U
Inform
ati
on
B
Ex
ecuti
on
 T
imes
38.1.7 L ERR LED [FX
3UC
-32MT-LT(-2)]
*1.
FX
3UC
-32MT-LT only.
→ For details, refer to the Hardware Edition of the PLC main unit.
Mode
LED status
PLC status
Action
ONLINE
Lit
Unit disconnected
Outside-control-range station 
error
RD station number setting
error
Securely connect the built-in master to remote I/O units and 
remote device stations on the network.
Make sure that the connected remote I/O units and remote device 
stations are consistent with the detailed information on remote 
stations.
Flickering
All stations are abnormal
Securely connect the built-in master to remote I/O units and 
remote device stations on the network.
Make sure that the connected remote I/O units and remote device 
stations are consistent with the detailed information on remote 
stations.
Unlit
Data link is being normally 
executed
CONFIG
*1
Lit
Used station numbers mismatch. 
(Remote stations are checked 
while the remote station 
information is edited.)
Securely connect the built-in master to remote I/O units and 
remote device stations on the network.
Make sure that the connected remote I/O units and remote device 
stations are consistent with the detailed information on remote 
stations.
Verify that remote device station numbers are within the allowable 
range.
Flickering
All stations are abnormal. 
(Remote stations are checked 
while the remote station 
information is edited.)
Unlit
Data link is being normally 
executed
TEST
Lit
The self-loopback test is 
abnormally finished.
Make sure that the power is correctly supplied to the PLC.
If the L RUN LED is on even after the above check, consult a 
Mitsubishi Electric representative.
Unlit
The self-loopback test is normally 
finished.
(This LED is off while the self-
loopback test is executing.)