Summer Infant 07260 Leaflet

Page of 1
Long end of 
Extension Pin
Tension
Knob
Tension
Bolt
Extension
Frame
Gate
Frame
Pad
Step 1: To use with extension frame assemble as shown in Figure A.
07260
Contents:
Two Extension Pins
One Extension Frame
Note: Do not use more than 3 total 
extensions per gate. Do not use 
more than 2 extensions per side.
W O O D   G AT E   E X T E N S I O N   F R A M E
Figure A
8/05
Summer Infant, Inc.
6 Blackstone Valley Place
Suite 206
Lincoln, RI 02865 USA
1-800-268-6237
©2003 Summer Infant, Inc.
Summer Infant Europe, LTD.
20 Sparrows Herne
Bushey, Hertfordshire WD23 1FX UK
44 (0)20 8420 4429
Step 2: Screw the tension knobs down the tension bolts until they 
contact the pads. Insert 4 tension bolts into holes on outside and slide 
inward towards frame as far as possible.
Long end of 
Extension Pin
Tension
Knob
Tension
Bolt
Extension
Frame
Gate
Frame
Pad
Step 1: To use with extension frame assemble as shown in Figure A.
07260
Contents:
Two Extension Pins
One Extension Frame
Note: Do not use more than 3 total 
extensions per gate. Do not use 
more than 2 extensions per side.
W O O D   G AT E   E X T E N S I O N   F R A M E
Figure A
8/05
Summer Infant, Inc.
6 Blackstone Valley Place
Suite 206
Lincoln, RI 02865 USA
1-800-268-6237
©2003 Summer Infant, Inc.
Summer Infant Europe, LTD.
20 Sparrows Herne
Bushey, Hertfordshire WD23 1FX UK
44 (0)20 8420 4429
Step 2: Screw the tension knobs down the tension bolts until they 
contact the pads. Insert 4 tension bolts into holes on outside and slide 
inward towards frame as far as possible.