Sterling Plumbing scc2 User Manual
Hopper Loaders with/without Sight Glasses
14
5. On 115 VAC control voltage systems, run a common hot (115 VAC) wire and
a common neutral wire from the controller to each pump package in the
system.
system.
On 24 VDC control voltage systems, run a common +24 VDC wire and a
common 0 (zero) VDC wire from the controller to each pump package in the
system.
common 0 (zero) VDC wire from the controller to each pump package in the
system.
Note:
Reference “Mechanical Components Operation and Installation
manual” for more details on component locations (manual part #
A0536580).
manual” for more details on component locations (manual part #
A0536580).
3-5 Set-up
This section provides the procedures for configuring your 2-pump, 20-
station controller.
station controller.
Configuration of your controller includes setting the number of stations
and pumps, setting variables such as convey time and blow-back interval,
and setting up passwords. We recommend that you carry out these
procedures in the order given here.
and pumps, setting variables such as convey time and blow-back interval,
and setting up passwords. We recommend that you carry out these
procedures in the order given here.
Note:
Before carrying out these procedures, install all equipment as described
in this section and in the Mechanical Components manual.
in this section and in the Mechanical Components manual.
Setting the Number of Stations and the Number of Pumps
Figure 2: Default “Station Status” Screen Before Setup
1. At the “Station Status” screen (Figure 2) or at the “Pump Status” screen, touch the Menu
button. The “Menu” screen opens.