Sterling Plumbing scc2 User Manual

Page of 52
Hopper Loaders with/without Sight Glasses 
 
14 
 
 
5.  On 115 VAC control voltage systems, run a common hot (115 VAC) wire and 
a common neutral wire from the controller to each pump package in the 
system. 
On 24 VDC control voltage systems, run a common +24 VDC wire and a 
common 0 (zero) VDC wire from the controller to each pump package in the 
system. 
Note: 
Reference “Mechanical Components Operation and Installation 
manual” for more details on component locations (manual part # 
A0536580).   
3-5 Set-up 
 
This section provides the procedures for configuring your 2-pump, 20-
station controller.  
Configuration of your controller includes setting the number of stations 
and pumps, setting variables such as convey time and blow-back interval, 
and setting up passwords. We recommend that you carry out these 
procedures in the order given here.  
Note: 
Before carrying out these procedures, install all equipment as described 
in this section and in the Mechanical Components manual. 
Setting the Number of Stations and the Number of Pumps 
Figure 2:  Default “Station Status” Screen Before Setup 
 
1.  At the “Station Status” screen (Figure 2) or at the “Pump Status” screen, touch the Menu 
button. The “Menu” screen opens.