Cma gw-100 Owner's Manual
Operation
3. Installation
3.1. Electrical
A 15 Amp, 120 Volt, 60 Hz dedicated circuit should be used to supply electrical power to the GL-C machine (see
specification sheet page 3). The power connection with the leads L-1, L-2 (N) and Ground must be such that there is
sufficient length of flexible conduit to permit the machine to be moved for cleaning.
specification sheet page 3). The power connection with the leads L-1, L-2 (N) and Ground must be such that there is
sufficient length of flexible conduit to permit the machine to be moved for cleaning.
MODEL GW-100 SERVICE & PARTS MANUAL Rev. 1.00 01/17/08
Page
4
Note: For cord-connected machines provide a grounding receptacle.
3.2. Plumbing
Making Cold Water Connection
1. Connect a cold 1/2” water line to the cold water solenoid valve and inspect for leaks. Water flow pressure
should be between 20-100 PSI.
2. Cold water usage is approximately 2.8 U.S. gpm.
3. Machine is equipped with a mixing valve located between hot and cold solenoid valves. Open until
temperature reaches 75
°F for areas with very cold rinse water to heat the rinse water which will prevent
glasses from cracking.
Making Hot Water Connection
1. Connect a hot 1/2” water line to the hot water solenoid valve. The temperature must be minimum 140
°F/60°C
with flow pressure between 20-100 PSI.
2. Hot water usage is approximately 12 U.S. gph.
Making Drain Connection
1. Connect a 1-1/2” PVC drain line to the bottom of the scrap tank. (note: machine is gravity drain)
*Electrical and plumbing connections must be made by a qualified
person who will comply with all available Federal, State, and Local
Health, Electrical, Plumbing and Safety codes.
person who will comply with all available Federal, State, and Local
Health, Electrical, Plumbing and Safety codes.